Skip to content

JARRETT REDUCES DAMAGE CLAIMS BY 44% AND PACKAGING OPTIMIZATION SAVES $120K+ ANNUALLY

MARLITE PARTNERS WITH JARRETT TO PROTECT FRAGILE FREIGHT, REDUCE CLAIMS AND IMPROVE CARRIER RELIABILITY

Download the case study to learn how Jarrett:

  • Reduced damage claims by 44% by identifying key packaging and loading improvements, including fully crated panels and consolidated adhesive palletization, following multiple on-site visits and collaboration with Marlite's team.

  • Cut shortages by 61% through improved packaging standardization, consolidation of loose trim pieces and updated loading processes that reduced exposure and streamlined delivery.

  • Improved freight control and carrier flexibility by doubling carrier options through network diversification and implementing a tailored multi-stop truckload program for higher-value orders.

Learn how Jarrett's proactive, hands-on approach to packaging optimization, carrier network diversification and multi-stop truckload management reduced damage claims by 44%, cut shortages by 61% and delivered more than $120,000 in annualized savings for Marlite.

If you're ready to turn logistical challenges into a competitive advantage, contact Jarrett today.

Marlite Thumnail Full Page

Customer
Marlite is the largest U.S. manufacturer of specialized interior wall systems, including slatwall and fiber-reinforced polymer panels. The company maintains a strategic national distribution network with three key operating facilities located in Dover, Ohio; Arlington, Texas; and Santa Fe Springs, Calif.

Overview
Marlite's fragile, overlength freight drove high damage claims and frequent shortages, with many carriers hesitant to handle shipments due to the claim potential. Jarrett analyzed Marlite's freight characteristics through multiple on-site visits, identified packaging and loading improvements and collaborated with Marlite's team to implement stronger crating, adhesive palletization and consolidated trim handling. Network diversification doubled carrier options, and a tailored multi-stop truckload program improved control over higher-value orders. The result was a 44% reduction in damage claims, a 61% reduction in shortages and more than $120,000 in annualized savings.


Simplify Your Supply Chain